Two timelines for one developer with five backlog items, each needing a week of work. In the top timeline, labeled "All five at once," all five bars stretch across the full five weeks and nothing is finished until week five. In the bottom timeline, labeled "One at a time," the items finish one after another at weeks one, two, three, four and five. The caption reads "Same work. Same five weeks. The first item reaches customers four weeks sooner."

Look at your team's board and count how many backlog items each developer has in progress. If you're like most of the engineering leaders I work with, the answer is four or five.

It looks like productivity. Everyone is busy and nobody is waiting for work.

But ask how long it's taking each of those items to reach customers, and you'll usually find it's getting longer, not shorter.

This isn't new

Developers were juggling five items at once long before anyone had heard of an AI coding tool. I watched it happen in the 1980s, and I've seen it in nearly every organization since.

It happens for ordinary reasons. A developer's item is waiting on someone else: a review, a tester, an answer from the business, another team's piece of the system. Nobody wants them sitting idle, so they start something else. Managers assign work to keep each person fully busy, because an idle developer looks like waste. Before long, everyone has several things going and nothing is moving quickly.

The underlying belief is that keeping every person busy keeps the work moving. It doesn't. It keeps the people moving. The work sits and waits.

AI made it worse

AI tools didn't create this problem, but they made it much easier to fall into.

Starting a new backlog item used to take real effort. A developer had to understand the problem, think through the design and write the first version by hand. That effort acted as a brake, even in teams that juggled too much. Now a developer can get a working first version from an AI in an hour, send it off for review and start the next one while it waits. The brake is gone, and the pile of half-finished work grows faster than it ever did.

Why five at once is slower than one at a time

Take one developer with five backlog items, each needing about a week of work.

If they work on all five at once, splitting their time evenly, every item is finished at the end of week five. Nothing reaches customers until then.

If they work on one at a time, the first item is finished at the end of week one, the second at the end of week two, and so on. All five are still done by the end of week five. But the first item reached customers four weeks sooner, and on average each item waited two weeks less.

Same developer. Same work. Same five weeks. The only difference is the order.

Now scale that up to the team. Five developers with five items each means twenty-five items in progress, and none of them finishing quickly. The same team working together on one item at a time finishes the first one in a day or two, then the next, then the next. The team does the same amount of work. Customers start getting it weeks earlier.

And that's the best case for working on five at once. In practice it's worse, because:

  • Every switch costs time. Each time a developer moves from one item to another, they have to remember where they were, what the AI produced and what the reviewer said. Moving between five items all day adds up to hours lost every week.
  • Reviews get shallow. When every developer has five items out for review, every reviewer has a long queue. They spend less time on each one, problems get through and come back later as rework.
  • Feedback arrives too late to be useful. By the time a review comes back, the developer has moved on twice. Fixing the problem means stopping something else, which starts the cycle again.
  • The team stops working together. Twenty-five separate pieces of work means almost no shared effort on any of them. Everyone is on the same team and working alone.

What to do instead

None of this needs new tools or more people.

  • Limit the whole team to one to three items in progress. Not per developer. Per team. When the limit is reached, nobody starts anything new.
  • Work on the same item together. With only one to three items in progress, most of the team is working on the same item at the same time. It gets reviewed and tested as it's built, questions get answered right away, and it's finished in a day or two instead of weeks.
  • When you're blocked, help finish what's in progress. If the part you're working on is waiting, help review, test or work out the next question. The team's job is to finish items, not to keep each person busy on their own.
  • Cap the rebuilds. If the AI agent hasn't produced the right result after two or three tries, the problem is the description, not the AI. Stop and rewrite it instead of starting something else while you wait.
  • Let the team set the limits. The people doing the work know where it piles up. Limits a manager hands down get worked around. Limits the team sets for itself get respected.

The first week will feel slower. Developers who are used to having five things going will feel crowded working on the same item as three other people, and some will feel idle. Stay with it. Within a few weeks, items reach customers sooner, reviews get better, and the team stops feeling like it's running to stand still.